Drainage Collector Cleaning Works
21 March, 2024
In Krtsanisi district, near Nikoloz Lortkipanidze Street N14, cleaning works of 800 mm drainage collector are underway.
The head of the collector is cleaned from the brought rock debris, after which the head structure and protective net will be arranged.