LLC Tbilservice Group

Hotline 2619050
Stormwater Drainage System Rehabilitation on Tavdadebuli Street
22 November, 2024
In the Didi Digomi settlement, on Demetre Tavdadebuli Street, a 520-meter section of the stormwater drainage system is being rehabilitated between N6 and N22. During the initial phase, pipes with a diameter of 500-600 mm were installed. Currently, a 300 mm network connecting rainwater inlets is being set up, along with 24 inspection manholes and grates.

The ongoing works were inspected by the director of Tbilservice Group, Giorgi Papava. The replacement of the drainage system is expected to be completed in the first half of December. Additionally, provider companies are rehabilitating water supply, sewage, and gas pipeline systems in the area.

The Tbilisi City Hall's Environmental Protection Service is also developing a recreational space in this territory.
Main About Us Media Center Services Legislation Projects
About Company News Current
Management Announcement Completed
Structure
Vacancy
Hotline
2 61 90 50
N67 Kakheti Highway
(Central office)